No. Make sure the TOP is level and all will be fine.
Michael Goins, k5wmg
Professor, Writing
University of Texas at San Antonio
On Mon, Apr 26, 2010 at 6:32 PM, Tommy Alderman
<aldermant@windstream.net> wrote:
>
>
> It has been posed to me by a local commercial construction supervisor, that
> I use a laser leveler to make sure the bottom of the anchor rod holes are at
> the same level. While I have great faith of this persons word (based on the
> experience he has on the job.), I have never heard of any ham going to these
> lengths. My tower site ground does not change drastically, possibly a foot
> difference from the other two holes.
>
>
>
> In you tower builders opinion, do you think this is a necessary step? Did
> you do it when installing your own tower?
>
>
>
> Many thanks for any input.
>
>
>
> 73,
>
>
>
> Tom - W4BQF
>
>
>
>
>
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|