It has been posed to me by a local commercial construction supervisor, that
I use a laser leveler to make sure the bottom of the anchor rod holes are at
the same level. While I have great faith of this persons word (based on the
experience he has on the job.), I have never heard of any ham going to these
lengths. My tower site ground does not change drastically, possibly a foot
difference from the other two holes.
In you tower builders opinion, do you think this is a necessary step? Did
you do it when installing your own tower?
Many thanks for any input.
73,
Tom - W4BQF
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|