I was told by a retired NASA radio engineer to avoid daisy-chaining the
equipment and then running a single run to ground. He says it is better
to run separate ground lines from each chassis to a single point ground
(bonded to the mains as is appropriate).
Does this contradict what you are saying?
=================== JHR ============================
On 5/16/2014 1:56 AM, Jim Brown wrote:
The proper bonding is CHASSIS-TO-CHASSIS of interconnected equipment.
One of those chassis MUST be bonded to the power system green wire, to
the antenna system entry panel, to the power system ground, and to all
other grounds in the building.
_______________________________________________
.
_______________________________________________
TenTec mailing list
TenTec@contesting.com
http://lists.contesting.com/mailman/listinfo/tentec
|