TenTec
[Top] [All Lists]

Re: [TenTec] Eagle problem?

To: Discussion of Ten-Tec Equipment <tentec@contesting.com>
Subject: Re: [TenTec] Eagle problem?
From: k6jek <k6jek@comcast.net>
Reply-to: Discussion of Ten-Tec Equipment <tentec@contesting.com>
Date: Thu, 15 May 2014 23:01:02 -0700
List-post: <tentec@contesting.com">mailto:tentec@contesting.com>
Why is braid to be eschewed especially inside the shack?

On May 15, 2014, at 10:56 PM, Jim Brown wrote:

> On 5/15/2014 7:45 PM, Carter wrote:
>>> Again, bond all equipment together at the power supply and forget abt a 
>>> dedicated external ground.
>> I can try removing the external ground. I currently have 3/4" wide single 
>> piece of braid going from the radio to the PS to the amp to an outside 
>> ground (total length from last unit in line to the hole in the basement wall 
>> is less than 5 feet). 
> 
> The proper bonding is CHASSIS-TO-CHASSIS of interconnected equipment. One of 
> those chassis MUST be bonded to the power system green wire, to the antenna 
> system entry panel, to the power system ground, and to all other grounds in 
> the building.
> 
> 73, Jim K9YC
> _______________________________________________
> TenTec mailing list
> TenTec@contesting.com
> http://lists.contesting.com/mailman/listinfo/tentec

_______________________________________________
TenTec mailing list
TenTec@contesting.com
http://lists.contesting.com/mailman/listinfo/tentec

<Prev in Thread] Current Thread [Next in Thread>