TenTec
[Top] [All Lists]

Re: [TenTec] Eagle problem?

To: Discussion of Ten-Tec Equipment <tentec@contesting.com>, "k9yc@arrl.net" <k9yc@arrl.net>
Subject: Re: [TenTec] Eagle problem?
From: Clayton Brantley via TenTec <tentec@contesting.com>
Reply-to: Clayton Brantley <clayton_n4ev@yahoo.com>, Discussion of Ten-Tec Equipment <tentec@contesting.com>
Date: Mon, 19 May 2014 12:15:43 -0700 (PDT)
List-post: <tentec@contesting.com">mailto:tentec@contesting.com>
You do NOT daisy chain the grounds.  The NASA engineer is correct.  There is 
ONE ground that
the equipment is tied to and NOT to other grounds.  For a picture, look at some 
of the Bell Systems
drawings about proper grounding.  All grounds in the building go to the SINGLE 
point ground and
not crossed as Jim wrote.

Clayton N4EV


On Monday, May 19, 2014 3:10 PM, TTMaven <jrichards@k8jhr.com> wrote:
 


I was told by a retired NASA radio engineer to avoid daisy-chaining the 
equipment and then running a single run to ground.  He says it is better 
to run separate ground lines from each chassis to a single point ground 
(bonded to the mains as is appropriate).

Does this contradict what you are saying?

=================== JHR ============================

On 5/16/2014 1:56 AM, Jim Brown wrote:

> The proper bonding is CHASSIS-TO-CHASSIS of interconnected equipment.
> One of those chassis MUST be bonded to the power system green wire, to
> the antenna system entry panel, to the power system ground, and to all
> other grounds in the building.
>

> _______________________________________________




.
_______________________________________________
TenTec mailing list
TenTec@contesting.com
http://lists.contesting.com/mailman/listinfo/tentec
_______________________________________________
TenTec mailing list
TenTec@contesting.com
http://lists.contesting.com/mailman/listinfo/tentec

<Prev in Thread] Current Thread [Next in Thread>