To: | "Tower and HF antenna construction topics." <towertalk@contesting.com> |
---|---|
Subject: | [TowerTalk] best way to seal concrete with cut off tower section |
From: | mike stokes <mike9v@gmail.com> |
Date: | Tue, 11 Jul 2017 18:41:09 +0000 |
List-post: | <mailto:towertalk@contesting.com> |
I am in the planning stages of replacing 95' of Rohn 25 with 100' of Rohn 45. The 25 has the bottom section concreted in. I plan on drilling and epoxying a pier pin for the Rohn 45. When I cut it off the 25, the holes in the legs will be exposed. What is the best method to seal the leg holes to ensure they don't get water in them and freeze ? Thanks in advance. -- Mike Stokes KK9V _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [TowerTalk] Coax choice for crank-up - looking for TT experience/recommendations, Bryan Swadener via TowerTalk |
---|---|
Next by Date: | Re: [TowerTalk] best way to seal concrete with cut off tower section, ersmar |
Previous by Thread: | Re: [TowerTalk] Coax choice for crank-up - looking for TT experience/rec, john |
Next by Thread: | Re: [TowerTalk] best way to seal concrete with cut off tower section, Clay Autery |
Indexes: | [Date] [Thread] [Top] [All Lists] |