I see no reason to epoxy the pier pin, anchor cement works fine.  You
could also pour the anchor cement in the cutoff tower legs.

John KK9A


From:   mike stokes <mike9v@gmail.com>
Date:   Tue, 11 Jul 2017 18:41:09 +0000


I am in the planning stages of replacing 95' of Rohn 25 with 100' of Rohn
45.  The 25 has the bottom section concreted in.  I plan on drilling and
epoxying a pier pin for the Rohn 45.  When I cut it off the 25, the holes
in the legs will be exposed.  What is the best method to seal the leg holes
to ensure they don't get water in them and freeze ?

Thanks in advance.

-- 
Mike Stokes
KK9V

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>