Re: [TowerTalk] Concrete

To: towertalk@contesting.com
Subject: Re: [TowerTalk] Concrete
From: Mac <libbysales@austin.rr.com>
Date: Mon, 26 Aug 2019 14:07:11 -0500
List-post: <mailto:towertalk@contesting.com>
Humm ?   a 20 Sq yd concrete truck  ..  ??

that's a very big and very heavy truck , more to the point, they don't make emm that big ...

mac/mc  w5mc

On 8/26/2019 1:15 PM, Bob Shohet, KQ2M wrote:
I used a different method which I will mention here just it case it may be 
helpful for a TT reader.

My qth is on irregular and jagged ledge – in some spots the ledge is at or just below the surface 
(like an iceberg) in other spots, as little as 1’ away, the dirt extends down for 4’ or more 
feet.  You can’t predict where it is; you can only dig and see where it actually lies.

My house sits in a small “valley” about 10 – 15’ below the top of the ledge which starts less than 15’ from 
the ends of the house.  Coming from the street down my driveway facing my house, you could almost imagine this as a “U” with the 
middle part of the “U” flat and very elongated.

Both of my towers are on the top of the ledge with no way to get there other than to climb up at 
a very steep angle > 30 degrees.  This made it impossible to get a large concrete truck, with 
20’ sq yds of concrete, up to the tower base.  And even if it made the first base, it 
could never get through the dense woods and over the boulders to get to the second base 
110’ feet away.  It was a challenge.

I decided to hire an experienced person with a SMALL backhoe.  We proceeded by having the large 
concrete truck drive to the base of the ledge, extend its concrete pouring chute to the top of the 
ledge and then pick up that chute and place it in the “scoop” of the small backhoe.  
(We had discovered that only a small backhoe could navigate the boulders and jagged ledge (although 
not without tearing and blowing out two backhoe tires in the process!))  The concrete truck then 
poured the concrete through the chute into the scoop of the backhoe filling it ~ 1/2 way.  The chute 
was taken out and the backhoe proceeded VERY slowly with the sloshing concrete and then poured it 
into slowly and carefully into the tower base and guy anchor holes (already strengthened with a cage 
or rebar and metal ties – previously made by N1MM and myself).  At each hole another employee 
of the concrete company worked with a concrete trowel, level and other tools to move and spread the 
concrete and level it properly.  We repeated this process many times over a  2 1/2 hour period so 
that we could fill in both tower bases and six guy anchor holes.

It was a slow and painstaking process but it produced outstanding results.  No 
concrete was lost or spilled, the concrete filled all the holes and spread and 
leveled beautifully and the highly complex and challenging terrain was 
overcome.  We even had ~ 1 yard of concrete left over which I had them dump 
into a depression in the driveway over an underground stream and which 
successfully filled and stabilized a mini-sinkhole.   :-)

This was in 1998 and cost ~ $1,050 cash for all the concrete, delivery, labor and 1/2 hour of 
overtime.  I had calculated that doing it all myself with renting a mixer, buying all the 
concrete mix, and other chemicals, would have cost at least $400 and consumed at least two 
full days.  I’m not sure if it would even have been possible to get the mixer through 
the woods and over the boulders to the two tower bases, and guy anchor holes on the ledge in 
the forest, but I do know that the labor would have been backbreaking – probably 
almost as bad as the weeks of chainsawing that I had to do in order to clear the dense forest 
for the tower locations.  I know that I would not have had results as good as having the 
professionals do it. There has been no issue with any of the concrete in the past 21 years.

I would also add that the pros know the temperature range that the concrete will set best at as well as the 
chemical composition of the concrete to give the best “pour” and “set”.  I 
certainly would not have known that.  For that information and knowledge alone to ensure the safety and the 
longevity of my installations, it was worth every penny!


73

Bob, KQ2M


From: k7lxc--- via TowerTalk
Sent: Monday, August 26, 2019 1:11 PM
To: towertalk@contesting.com ; xdavid@cis-broadband.com
Subject: Re: [TowerTalk] Concrete

  What size is your tower base?? In my opinion, mixing your own for a
typical tower base is not a cost effective undertaking unless you have some 
insurmountable access issue that prevents you from bringing in a mixer truck.
     I agree. I've poured dozens of tower bases and every base plan I've ever 
seen calls for 3kpsi concrete. The labor involved in buying, transporting, 
mixing and pouring a base yourself doesn't usually pencil out compared to 
having it delivered.

     And if there is an access issue, hire a line pump to get the mud in the 
hole. It'll pump up to 400 feet which should solve most problems.

Cheers,Steve    K7LXCTOWER TECH -Professional tower services for amateur and 
commercial
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
<Prev in Thread] Current Thread [Next in Thread>