I have an existing 25G tower base that is damaged and needs replacing. Two of
the four existing bolts align to the new base - What experience and advice
would the group offer regarding drilling the concrete, inserting a bolt and
epoxy it in ?
I could use the center pier pin as a place to add yet another bolt so end
strength would be more that assured.
Advice / Feedback / Thoughts on suppliers and supplies ?
73 NJ3U Rory
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|