Hi all
I have 4 towers that I will soon be installing. Two of the towers have a
base type mounting system, which is no problem. The other two are the
subject of this post.
Each tower has a base, some 5 feet long, which needs to be "planted"
into a concrete block. So far so good. But, what is the best way to make
sure that each post is 90 Degrees ?
Rope it with guys till the concrete cures ?
Any suggestions gratefully received !
Cheers
Adrian MW1LCR