Towertalk
[Top] [All Lists]

[TowerTalk] Wet setting conduit?

To: towertalk@contesting.com
Subject: [TowerTalk] Wet setting conduit?
From: Craig Sande <ae7i@yahoo.com>
Date: Wed, 30 Mar 2005 10:29:43 -0800 (PST)
List-post: <mailto:towertalk@contesting.com>
I am planning a tower base pour and my contractor has already dug the hole, 
framed it, and inserted the base.  When it comes to placement of the conduit, 
he has suggested "wet setting" the conduit sweeps.  The way he described it to 
me is that rather than creating a trench to the base ahead of time and bracing 
the conduit, he plans on partially filling the hole with concrete, then 
submerging the conduit sweep to the wall of the hole with some form of foam 
protective cap.  Then after the concrete has fully set, he will trench down 
along the side of the concrete base, ream out the protective foam cap, and 
extend the conduit to the house, ground trenches, etc.
 
Has anyone ever heard of this technique?  I've tried to find information on the 
internet without much success.
 
Thanks,
 
Craig, AE7I
_______________________________________________

See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless Weather 
Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions 
and ask for Sherman, W2FLA.

_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>