Roger wrote: "One aspect of this that always seems to be a problem is
how to attach the guys to the vertical. I'd be interested to hear how
others have accomplished this in a matter that is enduring."
I have a 60 foot vertical of tapered aluminum. It is guyed at about 40
feet. The guys are 3/16" Dacron rope attached with a stainless steel
hose claim. Although this vertical was put up last summer, it replaced
another vertical guyed in the same manner that had been up for about 4
years. When I took it down, the guys showed no fraying at the attachment
point during that 4 year period.
73,
Bob/AA6VB
_______________________________________________
Topband mailing list
Topband@contesting.com
http://lists.contesting.com/mailman/listinfo/topband
|