I thought my Scout package was complete with all the modules, PS, bracket,
and LDG Z-11 ATU. But you know all the concerns regarding having enough voltage
when using batteries? Well after doing some research and balanced out
building my own DC-DC voltage converter and decided on buying the package
already
built. Let me tell you for battery operations this is for me a MUST HAVE.
Keeps the voltage at 13.8. No regrets.
_http://stores.tgelectronics.org/default.htm_
(http://stores.tgelectronics.org/default.htm)
I just thought I would pass along since we are on the SCOUT topic.
Alan KB7MBI
Woodinville, WA
FISTS: 5702 CC: 1885 ARS: 582
SKCC: 1988 NAQCC: 058 ARCI: 12141
************************************** Get a sneak peak of the all-new AOL at
http://discover.aol.com/memed/aolcom30tour
_______________________________________________
TenTec mailing list
TenTec@contesting.com
http://lists.contesting.com/mailman/listinfo/tentec
|