| To: | nj0f@yahoo.com, towertalk@contesting.com |
|---|---|
| Subject: | Re: [TowerTalk] Guy anchors for AB-577 |
| From: | k7lxc--- via TowerTalk <towertalk@contesting.com> |
| Reply-to: | k7lxc@aol.com |
| Date: | Thu, 22 Feb 2018 13:19:07 -0500 |
| List-post: | <mailto:towertalk@contesting.com> |
> The location of the vertical is not accessible for concrete trucks so if I > can get away with using screw in anchors it would make this much easier. A truck-mounted line pump can pump concrete up to 400 feet if that'll help. There are also motorized wheelbarrows that you can rent to move the concrete around. I'll bet you a nickel either option is much cheaper than having screw-ins installed. Cheers, Steve K7LXC TOWER TECH _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | Re: [TowerTalk] vertical feedpoint and phased verticals, Jim Brown |
|---|---|
| Next by Date: | [TowerTalk] Winches, Wilson Lamb |
| Previous by Thread: | Re: [TowerTalk] Guy anchors for AB-577, George Dubovsky |
| Next by Thread: | Re: [TowerTalk] Guy anchors for AB-577, Andre VanWyk via TowerTalk |
| Indexes: | [Date] [Thread] [Top] [All Lists] |