To: | "towertalk@contesting.com" <towertalk@contesting.com> |
---|---|
Subject: | [TowerTalk] Replacing Linear Loading on Force 12 40/20 |
From: | Ray Conrad NM2O <nm2o@outlook.com> |
Date: | Sun, 5 Nov 2017 02:55:52 +0000 |
List-post: | <mailto:towertalk@contesting.com> |
I have a Force 12 40/20. The 40 Meters is a two element beam, using linear loading. The loading is made from coperweld wire. I'm in NNY and subject to icing each winter. Has anyone converted to a loading coil to replace the linear loading? The result ould be similar to the Cushcraft 2 el 40 Meter that uses a loading coil. 73, Ray NM2O _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | [TowerTalk] Fwd: Some Unique Heavy Lifting...., Hans Hammarquist via TowerTalk |
---|---|
Next by Date: | Re: [TowerTalk] Replacing Linear Loading on Force 12 40/20, Keith Dutson |
Previous by Thread: | [TowerTalk] Expansion joint in conduit, Zivney, Terry |
Next by Thread: | Re: [TowerTalk] Replacing Linear Loading on Force 12 40/20, Keith Dutson |
Indexes: | [Date] [Thread] [Top] [All Lists] |