Towertalk
[Top] [All Lists]

[TowerTalk] Thrust Bearing for 621/577 Military Masts

To: <towertalk@contesting.com>
Subject: [TowerTalk] Thrust Bearing for 621/577 Military Masts
From: "Ed G" <ed.n3cw@gmail.com>
Date: Sat, 28 Feb 2015 07:49:38 -0500
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>
Hello,
     Has anyone on the list ever tried to design or build an assembly that
would clamp on the top of an AB-577 or AB-621 mast and provide for mounting
of a thrust bearing, perhaps about a foot above the top of a rotator
(Tailtwister for ex)?  I'm trying to envision a way to transfer some of the
side wind loading from the rotator itself to the mast.
--Ed--



---
This email is free from viruses and malware because avast! Antivirus protection 
is active.
http://www.avast.com

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>
  • [TowerTalk] Thrust Bearing for 621/577 Military Masts, Ed G <=