| At 13:54 11/04/2005, n2ea wrote:
>Let's be clear, however:  Tensioned guys add load to a tower.
>Therefore, the tower will reach its material failure point
>sooner.
I beg to differ. The function of sensible guying is to prevent the tower 
from reaching its material failure point, or at least delay it.
>The function of the guys, is NOT to add strength to the
>system.  The function is to force a different failure mode,
>and the price of doing that will be reduced load rating, or
>earlier failure,
on the contrary, the function of guys IS to make the system stronger. After 
all, you do guy Rohn 25/45/55 don't you? Sensible guying here, and 
elsewhere, will increase the load rating and produce later failure.
Chris
_______________________________________________
See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless Weather 
Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions 
and ask for Sherman, W2FLA.
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 |