I have acquired an estate sale EZ-Way tower (RBX70-3) equipped with a =
positive pulldown winch assembly. It is in need of new 3/16 cabling as =
the old cable had broken and the tower had some sort of oddball lash-up =
to hold things in place as they were. I think I have figured out the =
proper pulley sequence and assume the 4 turns still on the drum was the =
correct original amount of turns there.....question is what is the =
best/proper way to install the new cable as I have no manual that might =
give me a hint. Do I start from the spring tension assembly (car lifter =
springs!) then to the base pulley and up to the winch drum or do I =
access the tension spring portion as a last step. Should I 'pre-tension =
the spring before connecting the new 3/16 aircraft cable?Any help =
appreciated. Also, since all sections are nestled down, should I place =
the 4 turns on the drum to the far left grooves on the drum since the =
down "microswitch" should be activated?
Thanks es 73,
Larry K1UO
--- StripMime Report -- processed MIME parts ---
multipart/alternative
text/plain (text body -- kept)
text/html
---
|