To: | <towertalk@contesting.com> |
---|---|
Subject: | [Towertalk] climbing pegs |
From: | N8KU@longwire.com (N8KU) |
Date: | Wed, 11 Sep 2002 13:47:53 -0400 |
I am about an inch away from buying the 100' Rohn SCL tower. The last stumbling block is that they want $140 *per section* to outfit it with climbing pegs. I was already told that welding some lightweight ladder onto the side would de-stabilize it and reduce the wind load rating. I am looking for alternatives. I hope I can do better than galvanized carriage bolts from Home Depot...? But I will use them if I have to. http://www.longwire.com 90% CW - 100% HF |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | [Towertalk] Mast Coupler, Bob Nielsen |
---|---|
Next by Date: | [Towertalk] EZ-Way Tower cable replacement, Larry Emery |
Previous by Thread: | [Towertalk] HDBX-48 Tower Install, jlturner |
Next by Thread: | [Towertalk] EZ-Way Tower cable replacement, Larry Emery |
Indexes: | [Date] [Thread] [Top] [All Lists] |