Towertalk
[Top] [All Lists]

[TowerTalk] Raising mast?

To: <towertalk@contesting.com>
Subject: [TowerTalk] Raising mast?
From: Fatchett.Mike@tci.com (Fatchett, Mike)
Date: Fri, 22 May 1998 15:20:39 -0600
In addition to Steve's comments I like to put a 2x4 or 4x4 under the mast
after clamping it down with the TB.  You can also bolt a muffler clamp or
two right above the TB just in case.

Mike
W0MU

-----Original Message-----
From: K7LXC [mailto:K7LXC@aol.com]
Sent: Friday, May 22, 1998 2:58 PM
To: BILL.MADDOCK@fluordaniel.com; towertalk@contesting.com
Subject: Re: [TowerTalk] Raising mast?


In a message dated 98-05-22 15:08:59 EDT, BILL.MADDOCK@fluordaniel.com
writes:

<<  I will be trying to raise a 24 ft long mast 2" OD 1/4" wall to the top 
      of my tower Rohn 45. The mast is already inside the tower it will just

      need to be raised up! I have a Rohn 25/45 ginpole, will this be strong

      enough for the job or should I look for another means? The mast weighs
      about 130 pounds.  >>

     The easiest thing to do is to hang a pulley on a horizontal rung at the
top of the tower and run the haul rope through it and then run it down the
inside of the tower. Attach the haul rope to the mast about 1/3 down from
the
top of the mast with a sling choker. Wrap it around the mast 2 or 3 times
and
pull it through itself and it'll never slip.

      Attach a pulley at the bottom of the tower and run the haul rope
through
it. This is called a snatch block and changes the direction of the haul rope
run from vertical to horizontal. Since you will need 260 pounds of pull to
hoist the mast (130 pounds up the rope inside the tower and 130 pounds down
the rope on the outside of the tower), you'll need a lawn tractor, winch or
a
bunch of friends to pull it up.

     When the mast reaches the thrust bearing, guide it in and through until
you run out of haul rope. Tighten the TB bolts to capture the mast. Now you
can move the choker down the mast (all you have to do is take tension off
the
choker and it'll slide). Have the ground crew put tension on the haul line,
loosen the TB bolts and they can continue lifting the mast up. Keep going
until you can slide the rotator in under the mast. Install the rotator,
lower
the mast into the rotator and then tighten the rotator mast clamp. You're
done.

     If you want to install antennas on the mast before you hoist it up
fully,
feel free. Mount the antenna and feedline pigtail, hoist the mast up, mount
the next antenna, etc.

     The other option is to install the naked mast and then climb the mast
with angle iron or aluminum steps pushing the antenna(s) up as you go. (This
is an advanced technique.)

Cheers and GL,  Steve  K7LXC

--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search.htm

--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search.htm

<Prev in Thread] Current Thread [Next in Thread>