Dear Grounding Gods:
I am finally getting my Tri-Ex LM-354 tower up and have a grounding
question. My shack and utility ground is approximately 100 feet from
the tower and its ground system (3- 8 foot rods with 1 inch strap from
the tower legs) which is on the other side of the house. I am
installing a 3in Schedule 40 run of pipe between the tower and other
side of the house to run my cables. Sould I also tie the two ground
systems together with a 100 foot length of No 4 or 6 copper ground wire
which I would put in the pipe, or are the two ground systems far enough
apart so I don't have to do this.
Thanks for the help.
Casey K7CK
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search
|