Anyone have any suggestions on how to make a 160M elevated full sized
vertcial the best way?
1. I have lots of Rohn 25. Probably 100'
2. I can buy more.
3. It MUST be an elevated system. (How to insulate?)
4. I don't want to use all Rohn 25. So what would be a good taper schedule
from 2" OD that would fit in a top section of Rohn 25? I have a great
supplier for aluminum, so it isn't a problem buying aluminum.
Thanks
Bill
Bill Fisher, N4VJ & K4AAA (EX KM9P)
http://www.contesting.com
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: K7LXC@contesting.com
Sponsored by Akorn Access, Inc & KM9P
|