Hello,
I'm brand new to the reflector but have used the digest form of the reflector
for help before. I have just finished running a beverage wire (540' long
about 8 - 10' high) towards 45 degrees (Europe for me). My problem is that
if I wanted to make it a termintaed beverage that my feed line would be about
1000' long based on how I had to run it on my land. I don't have any more
3/4" or 7/8" HL in that length so I was going to feed it at the end closest
end (which is the end closest to Europe) to my house which is still a good
500' away. What do I do with the unterminated end. Do I slant it down to
the ground starting at about 40' from the end like I would do if I were to
terminate it. Or should it end at the 8 -10' height that the rest of the
beverage is run at. Thanks for your help and 73, Jack W4NF
--
FAQ on WWW: http://www.contesting.com/topband.html
Submissions: topband@contesting.com
Administrative requests: topband-REQUEST@contesting.com
Problems: owner-topband@contesting.com
|