Topband
[Top] [All Lists]

Topband: Mounting feed wire inside the tower on a shunt feed.

To: <topband@contesting.com>
Subject: Topband: Mounting feed wire inside the tower on a shunt feed.
From: herbs@islands.vi (Herb Schoenbohm)
Date: Mon, 20 Dec 1999 16:40:13 -0400
N4UK wrote:

I'd be very
>> interested to find out if running the wire inside the tower will detract
>> from the overall system performance.


Ken,  I do remember constantly blowing out the dial lamps in my rotor control
box until I bypassed the leads to ground at the based of the tower.  A better to
solve that problem might be to make a choke coil with excess rotor cable at the
tower base.

Herb (KV4FZ)




--
FAQ on WWW:               http://www.contesting.com/topband.html
Submissions:              topband@contesting.com
Administrative requests:  topband-REQUEST@contesting.com
Problems:                 owner-topband@contesting.com


<Prev in Thread] Current Thread [Next in Thread>