To: | <topband@contesting.com> |
---|---|
Subject: | Topband: Mounting feed wire inside the tower on a shunt feed. |
From: | herbs@islands.vi (Herb Schoenbohm) |
Date: | Mon, 20 Dec 1999 16:40:13 -0400 |
N4UK wrote: I'd be very >> interested to find out if running the wire inside the tower will detract >> from the overall system performance. Ken, I do remember constantly blowing out the dial lamps in my rotor control box until I bypassed the leads to ground at the based of the tower. A better to solve that problem might be to make a choke coil with excess rotor cable at the tower base. Herb (KV4FZ) -- FAQ on WWW: http://www.contesting.com/topband.html Submissions: topband@contesting.com Administrative requests: topband-REQUEST@contesting.com Problems: owner-topband@contesting.com |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Topband: DF2PY, Mike Devereux - G3SED |
---|---|
Next by Date: | Topband: Shunt fed tower grounded guy wires, Kenneth Ramirez |
Previous by Thread: | Topband: Mounting feed wire inside the tower on a shunt feed., Gary Breed |
Next by Thread: | Topband: Mounting feed wire inside the tower on a shunt feed., Radios R Toys |
Indexes: | [Date] [Thread] [Top] [All Lists] |