Towertalk
[Top] [All Lists]

Re: [TowerTalk] Adjustments to Tower Base Pier J-Bolts

To: h.duck <h.duck@ameritech.net>, Paul Christensen <w9ac@arrl.net>, "'Grant Saviers'" <grants2@pacbell.net>, "TOWERTALK@contesting.com" <TOWERTALK@contesting.com>
Subject: Re: [TowerTalk] Adjustments to Tower Base Pier J-Bolts
From: Dick Green <dick@mailgreen.us>
Date: Sun, 23 Jul 2017 23:46:54 +0000
List-post: <mailto:towertalk@contesting.com>
Regardless of what you decide to do, I'd sure want to check the fit of the base 
before and after any adjustments and before bringing in a crane. Can the base 
section be disconnected from the rest of the tower for a test? f it's too 
tall/heavy for you and a helper or two to lift (e.g., a 20-footer), you might 
be able to lift it into place with a bucket loader.

73, Dick WC1M 

-----Original Message-----
From: h.duck [mailto:h.duck@ameritech.net] 
Sent: Sunday, July 23, 2017 5:16 PM
To: Paul Christensen <w9ac@arrl.net>; 'Grant Saviers' <grants2@pacbell.net>; 
TOWERTALK@contesting.com
Subject: Re: [TowerTalk] Adjustments to Tower Base Pier J-Bolts

Hi,

Just thinking out loud.

Is it necessary to remove the template?  Here's my thought.  Assuming it will 
work, try pushing the template up the bolts with the lower nuts, assuming there 
are nuts below the template, use plenty of lubricant.  If it is possible to 
raise the template up to within 3 or 4 inches of the top of the bolts, this 
should align the bolts for the tower.  Lower the tower down on to the bolts, 
lower the template by backing off the lower nuts.  This will result in leaving 
the template sandwiched between the lower nuts and the bottom of the tower.  
Don't forget to take off the top nuts before lowering the tower or you will 
need to lift it or buy three more nuts.

Howard, W A 9 Y B W

----- Original Message -----
From: "Paul Christensen" <w9ac@arrl.net>
To: "'Grant Saviers'" <grants2@pacbell.net>; <TOWERTALK@contesting.com>
Sent: Saturday, July 22, 2017 9:44 AM
Subject: Re: [TowerTalk] Adjustments to Tower Base Pier J-Bolts


> The issue is not just removing the template.  I could just cut it off.  I
> need to KNOW that the template can be removed without to ensure that the
> tower base will go on without difficulty.  We can't be playing around with
> this on the day the 200 ft. crane arrives for the installation.
>
> Paul, W9AC
>
> -----Original Message-----
> From: Grant Saviers [mailto:grants2@pacbell.net]
> Sent: Saturday, July 22, 2017 10:37 AM
> To: Paul Christensen <w9ac@arrl.net>; TOWERTALK@contesting.com
> Subject: Re: [TowerTalk] Adjustments to Tower Base Pier J-Bolts
>
>
>
> On 7/22/2017 6:47 AM, Paul Christensen wrote:
>> In fact, the template used during the pour cannot be removed.
>
> Why??  That has to be easier and less risky than any other idea proposed.
>
> Grant KZ1W
>
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk 


---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus


_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>