This is a bit if a stretch but hoping someone may have this around.
I require a Universal Towers B-30 base ASAP. I also need a 30-STRT,
although a 30-TAPR would work in a pinch, so I can set the base correctly.
Lead time from UT is too far out (10-12 weeks now) to coincide with an
existing pour. I am really trying to avoid two separate trips for the
excavation and concrete. UT can't guarantee any rush jobs given their
backlog of orders and shipping costs would be doubled.
I am located in Texas 75165. Already working with Texas Towers.
Any leads or help appreciated.
Thanks,
Barry
K7TOP
_______________________________________________
VHFcontesting mailing list
VHFcontesting@contesting.com
http://lists.contesting.com/mailman/listinfo/vhfcontesting
|