I used sawhorses with 2x4's going through the tower legs. After going
through the experience I would have used guy wires too. When you pour
the concrete in the hole it pushes the legs sideways so you need to hold
the tower from moving. Once the concrete is poured it is really hard to
move the steel even though the concrete is still liquid.
--
73,
-de John NI0K
https://www.qrz.com/db/NI0K
NE9U - Scott Jasper wrote on 9/5/2020 5:08 AM:
So I don't reinvent the wheel, whats the best method of installing the
first section with 4 foot legs into the 4 feet of concrete?
Best info I can find is legs need suspended 4 inches above bottom of
concrete...
can anyone share how they've done it?