To: | TowerTalk@contesting.com |
---|---|
Subject: | [TowerTalk] Cable on winch drum |
From: | Ron Young W8RJL via TowerTalk <towertalk@contesting.com> |
Reply-to: | Ron Young W8RJL <youngron@verizon.net> |
Date: | Tue, 16 Apr 2019 02:23:06 +0000 (UTC) |
List-post: | <mailto:towertalk@contesting.com> |
Somewhere I read that there should be a minimum of 2 layers of steel cable on a hand winch drum before the winch starts to pick up the load. Can any one confirm. I will be raising a US Tower MA40 mast from horizontal to vertical. Thanks & 73 Ron W8RJL Sent from AOL Mobile Mail Get the new AOL app: mail.mobile.aol.com _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [TowerTalk] K1PEK de NW2K - Towertalk Ads, n6sj |
---|---|
Next by Date: | Re: [TowerTalk] Cable on winch drum, Don Moman VE6JY |
Previous by Thread: | [TowerTalk] K1PEK de NW2K - Towertalk Ads, k7lxc--- via TowerTalk |
Next by Thread: | Re: [TowerTalk] Cable on winch drum, Don Moman VE6JY |
Indexes: | [Date] [Thread] [Top] [All Lists] |