When I built my first 90 foot vertical, I made the whole
thing out of three 30 foot pieces of 4 inch OD aluminum
irrigation tubing/pipe, guyed at the joints at 30 and
60 feet as well as at the top.  I didn't know any better.
It shimmied like crazy in the slightest wind.  I
eventually evolved the design to 30 feet of 4 inch,
30 feet of 3 inch 30 feet of 2 inch, again guyed at
30, 60 and 90 feet.  It didn't shimmy because it was tapered.
It would survive really bad storms,
only to have the top section buckle 6 months later
in no particularly high wind.   I repaired it, and the
same thing happened again.  Again, I repaired it, and
again, same problem.   Turns out it was
the dreaded aluminum fatigue.  The fix was to add guying
at the 75 foot level, in the center of the 2 inch section.
Never had a failure since.

Rick N6RK
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>