To: | <towertalk@contesting.com> |
---|---|
Subject: | Re: [TowerTalk] best way to seal concrete with cut off tower |
From: | "James Wolf" <jbwolf@comcast.net> |
Reply-to: | jbwolf@comcast.net |
Date: | Tue, 11 Jul 2017 19:06:07 -0400 |
List-post: | <mailto:towertalk@contesting.com> |
>>> I am in the planning stages of replacing 95' of Rohn 25 with 100' of Rohn 45. The 25 has the bottom section concreted in. I plan on drilling and epoxying a pier pin for the Rohn 45. When I cut it off the 25, the holes in the legs will be exposed. What is the best method to seal the leg holes to ensure they don't get water in them and freeze ? Mike, you might consider using a roof top mount on the concrete. I'm using one here. Jim - KR9U _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | [TowerTalk] SuperFlex Leoni Alternative, Keith Dutson |
---|---|
Next by Date: | Re: [TowerTalk] best way to seal concrete with cut off tower section, Clay Autery |
Previous by Thread: | [TowerTalk] SuperFlex Leoni Alternative, Keith Dutson |
Next by Thread: | [TowerTalk] G-800s Rotator Control lamp issue, Larry Banks |
Indexes: | [Date] [Thread] [Top] [All Lists] |