With small verticality errors, straightness is more important than vertical perfection.

Keeping the tower "in-column" is more important than a little lean.

Patrick        NJ5G

On 2/10/2016 2:24 PM, Stan Stockton wrote:
Doug,

In my opinion you should not lose an sleep over this project.  If you were able 
to suspend yourself in mid air, you could probably put a slight amount of 
pressure with one hand (perhaps two fingers) and make it plumb.  If it will 
make you feel better leave that plumb bob on it and when you tension the guy 
wires make sure it's perfect.

I have 13 towers up right now and have never in my life used a plumb bob on a 
tower.  They look pretty straight up and down to me :-)

73...Stan, K5GO

On Feb 10, 2016, at 12:58 PM, Douglas Ruz (CO8DM) <co8dm@frcuba.co.cu> wrote:

OK,

I am using a plumb bob...First test attaching a plumb bob at 20 ft level (top 
of 2nd tower section)...I see about 5/8 inch of deviation from Sight A and 1 
1/2 inch deviation from Sight B

73....Douglas, CO8DM

"No creo que haya alguna emoción más intensa para un inventor que ver alguna de sus 
creaciones funcionando. Esa emoción hace que uno se olvide de comer, de dormir, de todo." - 
Nikola Tesla
----- Original Message ----- From: "Ron Young" <youngron@verizon.net>
To: "Douglas Ruz (CO8DM)" <co8dm@frcuba.co.cu>
Sent: Wednesday, February 10, 2016 12:01 PM
Subject: Re: [TowerTalk] My first tower section is not plumb...


Drop a string with weight (plumb bob) from leg at 20 ft point. How far is 
string from leg at concrete base? Do it with no wind.
W8RJL

Sent from my iPhone

On Feb 10, 2016, at 11:30 AM, Douglas Ruz (CO8DM) <co8dm@frcuba.co.cu> wrote:

Hi,

I have a problem...i discovered my first tower section is not plumb...something 
happen after concrete cures. Remember i have 3 ft buried in concrete and 7 ft 
above concrete (1st section).

I add the 2nd section and i am planning install the 3rd section with the 
permanent guy wires.

What to do to correct the plumbing ??

Thoughts?

73....Douglas, CO8DM

"No creo que haya alguna emoción más intensa para un inventor que ver alguna de sus 
creaciones funcionando. Esa emoción hace que uno se olvide de comer, de dormir, de todo." - 
Nikola Tesla
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
<Prev in Thread] Current Thread [Next in Thread>