With a 25G, or clone, I used a Nylon rope rated at far more strength 
than needed.It's quite springy. I'd raise the section via gin pole until 
the base of the section being lifted was between the two bolt holes. it 
took a little pressure from one hand on the tower section to raise the 
base above the top of the section it would set on.  It's own weight 
would set it down. With a little down pressure I could line up yhe 
holes. Typically I'd use a taper pin punch on one leg, while positioning 
and inserting the bolts in the other legs.
I say it was solo, but I had someone available to call for help if needed.
Always have a safety person, be it your wife, a neighbor kid, or whoever.
73
Roger (K8RI)
On 12/2/2015 4:22 PM1, Zivney, Terry wrote:
 
I seem to recall a thread a long time ago about how Bill, KM9P, put up his 
towers without any assistance.  But, except for posting where he
stated he did so, I cannot find any details about how he did it.
In particular, once the tower section is hauled up with the gin pole
how is the tower section moved up and down as needed to seat it
on the existing tower?
Terry N4TZ
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 
 
--
73
Roger (K8RI)
---
This email has been checked for viruses by Avast antivirus software.
https://www.avast.com/antivirus
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 
 |