I only used 3500# concrete which was more than called for. Had we moved the tower base to where I would have preferred it, it would have pretty much doubled the concrete from 5 to 10 Cu Yards. Unfortunately the yard was just too soft and even the wheelbarrows were beginning to cause ruts. It'd been another $500 to a $1000 to get it pumped, but at only $120/yard It might have been the time, Then again, with that area being in the change from clay to peat, I don't think they'd have been able to dig the hole by hand. It would have required the steel, industrial forms and the equipment to handle them.

I gotta hurry and do something about that winch. Without modification, it'll never hold up. I need to drill out the supports for the bushings and add zerks to keep them greased.. I may need to replace the bushings with sintered bronze, grooved to distribute the grease. What ever, the industrial supplier will provide what I need.

The problem is, it takes me so much longer to do things, and I still estimate times as I did when everything worked.

Oh! I ordered the standard tilt plate, but one that doesn't go on top. I Think I'll run the mast up another 3 feet and mount the 144/440 duoband vertical on top.

73

Roger (K8RI)

On 7/26/2015 1:13 AM, Bryan Swadener via TowerTalk wrote:
I ordered 5000# concrete and according to my PE, was able to put my TX472 up in 
three days. As it turned out, because of other issues, I didn't get all my 
ducks in a row 'til about a week after the pour. 3  years later, it's still up 
with no adverse signs.
The only troubles I had were related to antennas & HDR300 rotator.
vy 73 es gl,Bryan WA7PRChttp://www.tinyurl.com/wa7prc-tower


Date: Sat, 25 Jul 2015 19:31:34 -0700
From: Chris N4XA
Subject: Re: [TowerTalk] Concrete Pad for U.S. Tower TX-472

Thanks guys. I am planning on waiting a few more weeks before raising the 
tower. We have been pretty lucky with some pretty consistent rain, which will 
only help hydration.

I ran into some rotor trouble today with the T2X, so that will give me some fun 
to pass the time away...

73's and see yall in the pile ups...

Chris
N4XFA
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk


--

73

Roger (K8RI)


---
This email has been checked for viruses by Avast antivirus software.
http://www.avast.com


_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>