Finally!
The contractor didn't get the tower base in while the ground was still
frozen, but Saturday they came out and dug the 4 X 4 X 7' hole by hand.
It only took about 10 minutes..for the second hole. At 4 to 5' they hit
a field tile running through my backyard. What's a field tile doing
there? It had a pretty good head too. A 4" stream shooting 18 to 24"
straight up.
Then weather stopped them after digging the second hole, which is good
as they set the base backwards. Today they are pumping out the hole,
digging out the dirt that had fallen in and rotating the base 180
degrees. Now to get the concrete poured. It'll take about an extra
yard, but the extra is good.
Three guys on wheelbarrows and they did 6 yards with only a tiny bit
left over.
After it cures a bit we can clean up around the site and pull the top
form in about a week. Then around the first of May I can hook the
tower to the base...I hope.
Wish we had taken this track instead of waiting for the winter freeze.
I could have had the tribander up and running last fall.
73
Roger (K8RI)
---
This email has been checked for viruses by Avast antivirus software.
http://www.avast.com
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|