Larry K4AB asks:
>I'm planning for a run of 400' and I'm thinking that maybe too long,
>even using the heavier cable.
I've never had a problem with my Yaesu G-1000. It was fed through a 435' foot
run using a mix of two-strands-in-paralleled of #18, single #18, and #12 wire.
It's a bit complex because I have bulkheads with lighting arrestors at both the
house and tower, and feed three rotators and a number of control boxes though
several shared wire bundles (I'll call them cables). Before rearranging
things, I had 10 different cables providing 50 distinct wires (plus a number of
shields/grounds) all run through the 325' underground conduit). I used heavier
wire (or two wires in parallel) for the motor runs. I did some cost
calculations and concluded that, for my situation, using a lot of locally
available (big box home improvement store) cable was more economical that any
"rotator" cable.
So, here's the details on my G-1000 wiring, it used the following:
18/10 cable is underground rated "sprinkler wire" - 10 insulated #18 wires
12/2 cable is UF ("underground feeder") grade "house wire" - 2 insulated #12
wires plus a bare ground wire
100' (from rotator to tower bulkhead) - 2 #18 in parallel for each line (2
motor lines, 3 indicator pot lines x 2 each for total 10 wires)
325' (from tower bulkhead to house bulkhead) - #12 for motor, single #18 for pot
10' (from control box to house bulkhead) 2 #18 in parallel for motor, single
#18 for pot
The 18/10 cable is underground rated "sprinkler wire"
The 12/2 is UF ("underground feeder") grade "house wire"
As a good undergraduate EE exercise you can look up the resistance of the #18
and #12 wire and do all the necessary calculations to calculate the total
resistance for the motor and pot lines (they're different) if you like. :-)
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|