Since we’re having non engineer inputs...
I’d much rather have guys near the top and a little close in than have 30’ of
tower flapping in the breeze (and eating out the holes in the legs and sawing
at the bolts).
I recently bought some used 25 with holes chewed out to at least twice original
diameter...no idea how it was installed.
Besides, you wouldn’t be climbing above the guys, as long as you use
temporaries on the way up from the others.
We need an engineer to chime in, but I’d bet that two sets would be enough??
Does anyone know the square foot rating of a 10’ section?
WL
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|