Background:

I have recently purchased the remnants of a failed tower from a friend of mine. The tower was originally 100 ft tall, of triangular construction and the legs were on a little over 14 ft centers (that is right over 14 feet not inches) where they were attached to 18 inch diameter concrete piers 7 ft deep into the ground. The tower held a wind generator and it failed due to gyroscopic forces applied by the rotating mass changing directions due to variable wind directions. A witness described the event as quite spectacular. Anyway the bottom two sections are in great shape, just a little surface rust. The legs are about 4 1/2 inches OD pipe and are joined at the 20 ft level by pipe flanges that are multiply through bolted. Ditto the connection to the pipe sections embedded in the 18 inch diameter piers. The cross braces are angle iron bolted together where they cross and attached at their ends to pad eyes welded to the steel legs. One leg has welded on ladder rungs alternating on either side of that leg. Two of the legs have hinged bases where they attach to the piers so the tower can be tilted up and down.

Over the years since installation lots of trees and brush has grown up around and through the lower of the two sections making tilting down for disassembly a real AXE MEN challenge ( hours of chainsaw work.) I have the chainsaws up to one with a 32 inch bar and a motor the size of a small dirt bike but it might be easier to just climb the tower and disassemble it from the top down. I have a friend who also has tower climbing experience and personal safety gear (harness etc.) We expect to get it taken apart and hauled off with a two day weekend effort. I have a welding trailer with 17.5 KW genset and air compressor to support the use of air driven impact tools for taking the rusty fasteners apart (or twisting them off if required.)

So far so good (just like the guy who fell from a 40 story building and as he passed the 20th floor he shouted out so far so good) Then comes the re-erection at my site.

Questions:

I am open for suggestions. Lacking credible objections from this august body I will try to assemble this 40 ft tower on the ground and tilt it up into place. I will have 360 degree access and freedom all around the site. I have a truck with a front mounted winch of 12,000 pound capacity. I have a good stock of 2 3/8 oil field pipe,k drill stem, etc and full welding, cutting, bending, whatever capacity in my shop.

Since in its new life this tower base is not holding up a 100 ft heavy duty tower what is a reasonable pier size and depth? I can auger up to 12 inch diameter holes up to nearly 6 ft deep with my equipment, Alternatively I have a ride on trencher (like a backhoe but self propelled not on the back of a tractor) that can dig a 13 inch wide trench down to 7 ft or so. I could block off part of the trench and back fill prior to the pour and have a more or less rectangular pier about 13 by xx inches up to about 7 ft deep but this is more effort and pending your input may not be required.

I intend to add a spiral (triangular) staircase around the outside of the tower to access the observation/work platform that I will install at the 40 ft level. This deck will be larger than the tower's triangle dimensions at the top (40 ft level) and so will be cantilevered. I will not extend this deck so wide as to extend beyond a vertical projection of the piers thus not risk a tip-over event due to any load of sightseers. I want to install an automated crank-up tower inside this tower such that when fully lowered you can stand on the platform and access the lowest antenna on the tube coming out of the center of the top of the crank-up tower.

Any thoughts?

How much pier diameter and depth into the ground is enough?

Gin pole recommendations for tilting up after reassembly?

I assume I would install the crank-up tower inside the 40 footer prior to tilting the tower upright but will entertain alternative suggestions.

TIA for any help

Patrick AF5CK
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>