> Does anyone hold drawings for a concrete base for a 54 foot crank-up
that has been approved for 100 MPH winds?
Really?!? You mean in the retracted position, right? That's the only
way I could see that happening, especially if it's an older tower.
It sounds like your town building department isn't too rigorous since
you never mentioned needing PE wet stamped drawings. And especially since
your tower meets their 100 MPH requirement. Fairfax County looks like a 70
MPH windspeed zone but since it's close to the coast, their could be big
winds occasionally.
Cheers,
Steve K7LXC
TOWER TECH
and
Champion Radio Products
Cell: 206-890-4188
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|