| 
On Dec 22, 2011, at 2:18 PM, David Gilbert wrote:
> I put up an An Wireless HD-70 tower and exothermically welded some 
> ground wires to the base section before it was embedded in the concrete, 
> figuring that down there (roughly four feet below the surface of the 
> concrete) 
Poor choice AFAIK.   My understanding is that if the tower gets takes a heavy 
hit by lightning, the wire could vaporize and crack the concrete.
Ken WA8JXM
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
 |