I can't imagine that being a good idea.
The base that was original extends into the concrete via a welded cage or
the attachment to other tower (which does the same thing) and is then bolted
to the tower. I would be surprised if you could drill holes deep enough to
manage the stress of windloading with just a simple bolt replacement into
epoxied holes.
Mike, k5wmg
Pipe Creek, Texas
A thousand words a day. Five days a week. For life.
On Tue, Feb 8, 2011 at 4:54 PM, Richard Zalewski <dick.w7zr@gmail.com>wrote:
> I will be upgrading my tower and will be using my existing base. This will
> require drilling the existing concrete base and epoxing in some new bolts.
> I would be interested in exchanging some emails with someone who has done
> this.
>
>
> --
> Tnx es 73
> Richard W7ZR
> www.w7zr.com
>
> *WHAT HAVE YOU DONE WITH WHAT YOU HAVE BEEN GIVEN?*
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|