OK, what's the procedure to prevent condensation from forming inside the
center conductor of either LMR-1200 [which uses a hollow cu tube for a center
conductor].... or ditto with 7/8" heliax ??
Are we supposed to blow dry nitrogen / dry air / hot air down the inside of
the CU tube 1st..for a few minutes, before installing 7-16 dins on each end ?
My thought was if any high humidity air was 1st blown out, before connector's
installed, coax installed, and connector's are water proofed, then
we should have minimal problems down the road.
Is my plan a waste of time ?
Later.... Jim VE7RF
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|