tshepom.mmolotsi@gmail.com wrote:
> Hi
>
> I have a 20m tower that is due to strengthening to accomodate new antenna
> loading. We strengthening the existing foundation by placing concrete block
> on top of the existing one. My problem is with grouting of the legs to 14m,
> hw can I acheive this?
>
I'm confused by the 20 meters and 14 meters..
So, you have a 20m tower now that is sitting on a concrete foundation
block of some sort.
You want to add concrete to the *top* of the existing block? (so the
distance from top of concrete to top of tower will become less?)
Are you trying to shorten the tower (from a bending standpoint), by
embedding the bottom 6 meters of the tower in concrete?
Seems there are easier ways to solve this problem.
Is the tower freestanding or guyed?