temporary guy below where you normally do, drop your top guys, lower
the hazer, reattach your upper guys, then drop your temp ones and
crank down...it's a pain, but better safe than sorry...
On Tue 04/ 6/10 8:21 AM , K7LXC@aol.com sent:
In a message dated 3/30/2010 8:22:57 P.M. Pacific Daylight Time,
towertalk-request@contesting.com [1] writes:
> I have been thinking about putting up a Rohn25 with a homemade
steel
welded Hazer. From what I have read, if you do not want to do any
climbing with the Hazer above you, the tower will be temporarily
self
supporting because you
need to drop a couple of guys until the assembly is lowered below
it. True?
Unfortunately yes. IMO it's a terrible technique although many
people
do it.
Cheers,
Steve K7LXC
TOWER TECH -
Professional tower services for hams
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com [2]
http://lists.contesting.com/mailman/listinfo/towertalk [3]
Links:
------
[1] mailto:towertalk-request@contesting.com
[2] mailto:TowerTalk@contesting.com
[3] http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|