| To: | towertalk@contesting.com |
|---|---|
| Subject: | [TowerTalk] Schedule 40 6" OD by 12' pipe |
| From: | Michael Keener <mgkeener@cox.net> |
| Date: | Sun, 2 Aug 2009 10:36:37 -0700 |
| List-post: | <towertalk@contesting.com">mailto:towertalk@contesting.com> |
ALL, I have had my wet stamp for my tower spec for 3 above ground anchor posts, 12' by 6"od does anyone no of any location near 92020 (El Cajon, CA). The reason for height is I have many grandchildren that will be using the backyard, and I dont want to chock anyone LOL, Thanks for your help 73 Mike/K6mgk _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | [TowerTalk] Pictures of the top of my towers, Alfredo Velez WP3C |
|---|---|
| Next by Date: | Re: [TowerTalk] Pictures of the top of my towers, Joe - WDØM |
| Previous by Thread: | [TowerTalk] Pictures of the top of my towers, Alfredo Velez WP3C |
| Next by Thread: | Re: [TowerTalk] climbing technique, K7LXC |
| Indexes: | [Date] [Thread] [Top] [All Lists] |