In a message dated 1/25/2009 8:30:04 A.M. Pacific Standard Time,
towertalk-request@contesting.com writes:
> Situation
I have been given an 8 section tower. 1/2 of the bottom section is cemented
into the base. We will take the tower top seven sections down, then saw off
the legs of the bottom section at the cement base.
> Question
Was this an approved method of installing a tower? Will it be better to
purchase the three factory legs to place into the cement base.
This is a technique used by hams all the time and the only downside is
that the tower gets shorter over time each time you cut it off and move it.
Feel free to do the same thing with no problems.
Cheers,
Steve K7LXC
TOWER TECH
**************From Wall Street to Main Street and everywhere in between, stay
up-to-date with the latest news. (http://aol.com?ncid=emlcntaolcom00000023)
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|