To the tower knowledgeable:
Rohn's mechanical drawing of concrete bases for guyed towers shows a
"bearing plate" on top of the concrete base, apparently concentric with the
pier pin. I can't find such an article - the only references I find to a
"bearing plate" are mounting arrangements for a thrust bearing.
Is this a drawing error?
Do I need to place something between the pier pin base assembly and the
concrete?
Can someone recommend a substitute?
I finally had concrete poured last week, so I'm gearing "up" for some fun!
Thanks,
Brian K1LI
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|