I've used the tow truck boom method with a US Tower TX-472MDLP (~1300lb).
Worked like a charm. The tow truck extended the boom into the back of the
box truck that delivered the tower, swung it around and lowered it
horozontally onto the base and I inserted the two pivot bolts. Once my
rotor, mast and antenna were installed, I used the raising fixture to lift
the tower to it's vertical position.
Good luck.
73 de Al, KE1FO
-----
Visit my amateur radio contesting blog at ke1fo.wordpress.com.
On Sat, Jun 7, 2008 at 9:22 PM, Bill Winkis <kc4pe@bellsouth.net> wrote:
> When first installing the tower after the "Tilt Over Frame" is in
> place......My Question is "How do you maneuver/wheel the tower into the
> correct horizontal position", do you use some sort of low dolly
>
> Using the tilt over frame ....... you move the tower in on the backside of
> the frame...then align the two side by side base/tower bolts, insert the two
> bolts .... then the crank up the tower to a vertical position...with the
> re-positioned hand crank.....
>
> But how do you move around 1600 pounds of tower lying one foot off the
> ground....
>
> -Bill
> kc4pe@bellsouth.net
>
>
> _______________________________________________
>
>
>
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
>
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|