Towertalk
[Top] [All Lists]

[TowerTalk] Crank-Up Tower Base Question

To: TowerTalk <towertalk@contesting.com>
Subject: [TowerTalk] Crank-Up Tower Base Question
From: RICHARD SOLOMON <w1ksz@q.com>
Date: Sun, 2 Dec 2007 20:09:19 +0000
List-post: <mailto:towertalk@contesting.com>
I plan to install an LM-470 in the near future. The base specs are 3'6 X 3'6 X 
7 feet. A note
on the drawing mentions ..."undisturbed soil"... . The Backhoe Operator tells 
me the hole he
digs will be more like 6' X 6' and the will use concrete forms to reduce it to 
the required size.
After the forms are removed, they will backfill the hole.
 
What do you folks think of that plan ? 
 
Thanks, Dick, W1KSZ/7 
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>