I am digging a hole to install my rohn 25g tower.
I have the cement and am trying to make sure after reading the rohn
documentation that I have interpreted all of this correctly.
I am going up 40 feet at this point (ONE EACH THREE ELE TRIBANDER AND ROTOR)
with plans to add to the tower later with additional
sections.
I will be using part of a section in the ground (4 feet I think) and then
attaching the rest I suppose by using a home made gin
pole.
The dimensions as I understand it for the hole should be:
2'X2'X4'
Before I go out there in this rocky soil and break my back with my pick and
shovel I would just like to know that the dimensions and
procedure are correct. :)
Then I lay 3' of gravel which I have, center the section in the whole, try to
devise someway to hold it still after checking it with
my level and plumb-bob and pour.
No guy wires at this point in time. 20 meters here I come.
Is that about it??
TNX BOB AD5VJ
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|