To: | K8RI <K8RI-on-TowerTalk@tm.net>, <TOWERTALK@contesting.com> |
---|---|
Subject: | Re: [TowerTalk] BASE REBAR and Lightning |
From: | Jim Lux <jimlux@earthlink.net> |
Date: | Fri, 5 Oct 2007 21:40:37 -0700 |
List-post: | <mailto:towertalk@contesting.com> |
> Those guys aren't following standard concrete practice (avoiding things > sticking through the concrete/soil interface) That's in the ROHN manual for bracketed towers, or it is in the older ones. Re Drawing # A871298 I should have said generic concrete practice. _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [TowerTalk] Measuring coax loss with MFJ-259B, VR2BrettGraham |
---|---|
Next by Date: | [TowerTalk] Measuring coax loss with MFJ-259B, Robert Chudek |
Previous by Thread: | Re: [TowerTalk] BASE REBAR and Lightning, Jim Lux |
Next by Thread: | Re: [TowerTalk] Wooden poles, kh6nd |
Indexes: | [Date] [Thread] [Top] [All Lists] |